NameBatteryP.PlantTowerDGMisc Info
Yingkiong2000AH HBL One set ok, 2nd set no connectorDelta 100AX340m GBT25KVA Mahindra, 25KVA Greaves 2 NosMinilink to DC Office BTS through DCME 10 TS
DC Office YKG600AH HBL 1 setDelta 25AX4 Single PH9m MARRDGMinilink to Karko
Jengging600AH HBLDelta 25AX4 Single PH12m MARRDGMinilink to Karko
Geku600AH HBLDelta 25AX4 Single PH12m MARRDGMinilink to Karko
TutingBatteryP.PlantTowerDGMisc Info
Riga400AH 2 setsDelta 100AX340m GBTDGMinilink to DC Office BTS through DCME 10 TS
Boleng600AH HBLDelta 25AX4 Single PH12m MARR25KVA Mahindra (Bat Changrd in Feb-13), 25 Greaves 2 NosMinilink to Karko
Mariyang600AH HBLDelta 25AX4 Single PH40 M25KVA Mahindra (Bat Changed in Mar-12)Minilink to Karko
Damro600AH HBLDelta 25AX4 Single PH40 M25KVA Mahindra (Bat Changed in Mar-12)Minilink to Karko
Katan600AH HBLDelta 25AX4 Single PH12m MARRNBSNLMinilink to Karko
HISTORY
Yingkiong Main Exch
  • GSM 2G 2964 444 INDOOR ERICSSON BTS
  • CDMA 1X ZTE
  • C-DOT SBM CDR Compatible done on 09/03/2013. CDR tested OK on 11/03/13
  • WiMAX installed in Dec 2012
  • IDR 8MB working with 100 watt SSPA
  • OFC from Geku to Yingkiong completed in July 2012
  • Mini-Link Ericsson 4E1 working between Yingkiong Main Exch and DC Office BTS.
  • Mahindra 25 KVA DG installed in August 2012, Battery changed in Oct-2012.
  • Greaves DG 2 sets available (One was working- Battery changed in March-2013)
DC Office Yingkiong
  • GSM 2G 2202 220 Indoor Ericsson BTS, 10 TS given on IDR-DCME-Minilink
  • 600AH Maxlife Battery
  • Delta Single phase power plant
  • 4E1 Minilink connectivity from Main Exch
  • DG was shifted to Main exch in 2010 and lying at main exch
Jengging USO
  • GSM 2964 244 Outdoor Ericsson BTS installed in USO campus
  • 50 Metre USO tower, Antenna at top.
  • WiMAX installed and tested in Dec-2012
  • 200AH battery and Single Phase power plant. 
  • 25KVA Mahindra DG in non-working condition
Jengging Old
  • MARR Tower 15 metre, WLL antenna at top
  • ZTE micro BTS working on V-SAT
  • 600 AH battery installed in Aug-2012
  • IDR 2MB working for GSM BTS (Extended to USO campus)
  • 25KVA Mahindra DG in working condition
Geku
Riga
  • Ashok Leylond 15 KVA (Bat changed in Mar-2012)
  • 3PH Transformer changed on 09/03/2013 by JE Electrical Boleng
Boleng
Tuting
Mariyang
Damro
Katan

lat-longs

Name Latitude Longitude Height feet Remark
Yingkiong Tower 28.6425 95.02985 1414 Main Exchange
DC Office BTS YAN002 28.63434 95.02599 1550
Jengging USO Tower 28.54782 95.06330 2605
Jengging WLL BTs 28.54721 95.06317 2647
Geku 28.42258 95.08960
Riga 28.41225 95.04418 3500
Boleng 28.32260 94.95642
Tuting 28.99368 94.88867 1940
Mariyang 28.49231 95.21463 3670 Exchange
Damro 28.44647 95.24344 3700 BTS
Katan 28.31460 95.15907 3205 WLL BTS in our buliding
Gobuk Hill Top 28.5597 95.11781 5368 Proposed Tower
Janbo 28.79424 94.85786 3590 GREF Land
Riew 28.32748 95.05842 2123 Site suitable for BTS and Minilink
Karko Microwave Tower 28.57374 95.05404 2488 Land owner Boni Jonkey
Karko Minilink Tower 28.57306 95.05959 2100 Temporary MARR Tower till the Microwave comes
Sitang 28.38646 95.05868 2992 Proposed site
Extra lat-longs
Name Latitude Longitude Height feet Remark
Nubo Bridge 28.57711 95.07215 1083 Start point Yingkiong side
Shimong School 28.60377 95.07520 3078 Taken on Road
Unknown Tower 28.23792 94.94703 100ft appx Msmt taken on road, Tower on hill 23 KM from Boleng towards Aalo
Rebo CO Office 28.30629 95.05172 xx Newly Constructed
Rebo CO res 28.30306 95.05072 xx CO Residence
Rebo Nudi 28.30818 95.05166 xx On Hill Top, No road link
Rebo Jalek 28.31323 95.05308 xx Very much inaccessible and on very remote place to maintain
Rebo Rjing 28.31853 95.05241 xx Very much inaccessible and on very remote place to maintain
Bomdo 28.75525 94.89572 2139 On Main road
Gobuk Helipad 28.57706 95.10953 5406
Gobuk Village 28.5768 95.1261 4000 On road
Bridge on way to Mariyang 28.5115 95.17799 10 KM before Mariyang
On way to Katan 28.32612 95.11986 4553 10 KM before Mariyang
Tuting USO 28.99356 94.88883 1910
Riew Extra site 28.33192 95.05206 3628 Not to be taken, although suitable

6 comments:

  1. Mariyang IDR Up-converter down for 7 days Restored on 8/4/2013

    ReplyDelete
  2. Durlabh Bhuyan Casual labour left Geku in mid of February 2013 due tto harassment by local guys

    ReplyDelete
  3. Jengging IDR UP-Converter went faulty on 12/6/13 & restored on 17/6/13

    ReplyDelete
  4. Geku CPE 8E1 gone faulty on 06/07/2013. Restored on 07/07/2013 with a spare one which was kept for Komkar minilink site.

    ReplyDelete
  5. Jengging VSAT failed on 15/09/2013 due to thundering around 4 a.m and DXU cad got faulty.

    ReplyDelete
  6. Jengging DXU replaced on 23/09/2013 and BTS restored through Minilink by giving 1 E1 of IDR Yingkiong